GIGANTIC Projects
INTERNATIONAL AIRPORTS
FIRST MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: COUMBA ANSOU CISSE INTERNATIONAL AIRPORT
TRADEMARK: CACIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: MUNICIPALITY OF KOUSSY, DEPARTMENT AND REGION OF SEDHIOU, SOUTHWEST OF THE REPUBLIC OF SENEGAL.
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS: TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A: DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A: DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B: ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A: DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B: ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A: DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B: ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A: DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B: ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET: THE ECOWAS POPULATION
2ND TARGET: REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS: SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES: TWENTY-FIVE (25)
NUMBER OF HANGARS: FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS: FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES: TEN (10)
NUMBER OF FUEL FACILITIES: TWO (02)
NUMBER OF WAREHOUSES: TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS: FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS: FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL: FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS: TWO (02)
NUMBER OF TRAINING FACILITIES: TEN (10)
NUMBER OF CATERING & DINING FACILITIES: TWO (02)
NUMBER OF PARKINGS: TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS: FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES: FIVE (05)
NUMBER OF SUPPORT FACILITIES: FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL: ONE HUNDRED (100)
NUMBER OF DORMITORIES: TEN (10)
NUMBER OF BUSINESS CENTERS: TEN (10)
NUMBER OF AVIATION FAIR AREA: TEN (10)
ANNEXED PROJECTS:
PROJECT NAME: TERANGA AVIATION ACADEMY
TRADEMARK: TAA
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME: TRANSCONTINENTAL AERONAUTICAL UNIVERSITY
TRADEMARK: TAU
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
SECOND MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: BACARY DEMBA SIDY NDIAYE INTERNATIONAL AIRPORT
TRADEMARK: BDSNIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: MUNICIPALITY, DEPARTMENT AND REGION OF KEDOUGOU, SOUTHEAST OF THE REPUBLIC OF SENEGAL.
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS: TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A: DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A: DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B: ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A: DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B: ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A: DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B: ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A: DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B: ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET: THE ECOWAS POPULATION
2ND TARGET: REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS: SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES: TWENTY-FIVE (25)
NUMBER OF HANGARS: FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS: FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES: TEN (10)
NUMBER OF FUEL FACILITIES: TWO (02)
NUMBER OF WAREHOUSES: TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS: FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS: FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL: FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS: TWO (02)
NUMBER OF TRAINING FACILITIES: TEN (10)
NUMBER OF CATERING & DINING FACILITIES: TWO (02)
NUMBER OF PARKINGS: TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS: FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES: FIVE (05)
NUMBER OF SUPPORT FACILITIES: FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL: ONE HUNDRED (100)
NUMBER OF DORMITORIES: TEN (10)
NUMBER OF BUSINESS CENTERS: TEN (10)
NUMBER OF AVIATION FAIR AREA: TEN (10)
ANNEXED PROJECTS:
PROJECT NAME: NEW AVIATION ACADEMY
TRADEMARK: NAA
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME: GLOBAL AERONAUTICAL UNIVERSITY
TRADEMARK: GAU
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
THIRD MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: ELHADJ OUMAR TALL INTERNATIONAL AIRPORT
TRADEMARK: HOTIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: MUNICIPALITY AND DEPARTMENT OF BAKEL, REGION OF TAMBACOUNDA, SOUTHEAST OF THE REPUBLIC OF SENEGAL.
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS: TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A: DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A: DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B:ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A:DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B:ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A:DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B:ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A:DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B:ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM: FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:THE ECOWAS POPULATION
2ND TARGET:REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:TWENTY-FIVE (25)
NUMBER OF HANGARS:FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:TEN (10)
NUMBER OF FUEL FACILITIES:TWO (02)
NUMBER OF WAREHOUSES:TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:TWO (02)
NUMBER OF TRAINING FACILITIES:TEN (10)
NUMBER OF CATERING & DINING FACILITIES:TWO (02)
NUMBER OF PARKINGS:TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:FIVE (05)
NUMBER OF SUPPORT FACILITIES:FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:ONE HUNDRED (100)
NUMBER OF DORMITORIES:TEN (10)
NUMBER OF BUSINESS CENTERS:TEN (10)
NUMBER OF AVIATION FAIR AREA:TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:HIGH AVIATION ACADEMY
TRADEMARK:HAA
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:INTERCONTINENTAL AERONAUTICAL UNIVERSITY
TRADEMARK:IAU
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
FOURTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: ELHADJ MALICK SY INTERNATIONAL AIRPORT
TRADEMARK: EMSIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: DEPARTMENT AND REGION OF SAINT-LOUIS, NORTHEAST OF THE REPUBLIC OF SENEGAL.
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A:DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B:ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A:DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B:ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A:DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B:ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A:DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B:ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A:DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B:ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:THE ECOWAS POPULATION
2ND TARGET:REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:TWENTY-FIVE (25)
NUMBER OF HANGARS:FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:TEN (10)
NUMBER OF FUEL FACILITIES:TWO (02)
NUMBER OF WAREHOUSES:TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:TWO (02)
NUMBER OF TRAINING FACILITIES:TEN (10)
NUMBER OF CATERING & DINING FACILITIES:TWO (02)
NUMBER OF PARKINGS:TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:FIVE (05)
NUMBER OF SUPPORT FACILITIES:FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:ONE HUNDRED (100)
NUMBER OF DORMITORIES:TEN (10)
NUMBER OF BUSINESS CENTERS:TEN (10)
NUMBER OF AVIATION FAIR AREA:TEN (10)
ANNEXED PROJECTS:
PROJECT NAME: FOUTA AVIATION ACADEMY
TRADEMARK: FAA
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME: DJOLOF AERONAUTICAL UNIVERSITY
TRADEMARK: DAU
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
FIFTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME:CHEIKH AHMADOU BAMBA INTERNATIONAL AIRPORT
TRADEMARK:CABIA
TYPE:22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION:DEPARTMENT AND REGION OF DIOURBEL, NORTHWEST OF THE REPUBLIC OF SENEGAL.
LAND AREA:EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A:DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A:DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B:ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A:DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B: ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A: DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B: ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A: DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B: ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:THE ECOWAS POPULATION
2ND TARGET:REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:TWENTY-FIVE (25)
NUMBER OF HANGARS:FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:TEN (10)
NUMBER OF FUEL FACILITIES:TWO (02)
NUMBER OF WAREHOUSES:TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:TWO (02)
NUMBER OF TRAINING FACILITIES:TEN (10)
NUMBER OF CATERING & DINING FACILITIES:TWO (02)
NUMBER OF PARKINGS:TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:FIVE (05)
NUMBER OF SUPPORT FACILITIES:FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:ONE HUNDRED (100)
NUMBER OF DORMITORIES:TEN (10)
NUMBER OF BUSINESS CENTERS:TEN (10)
NUMBER OF AVIATION FAIR AREA:TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:BAOL AVIATION ACADEMY
TRADEMARK:BAA
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:MOURID AERONAUTICAL UNIVERSITY
TRADEMARK:MAU
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
SIXTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: TAMARTA MASSALY INTERNATIONAL AIRPORT
TRADEMARK:TAMIA
TYPE:22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: DEPARTMENT AND REGION OF TAMBACOUNDA, SOUTHEAST OF THE REPUBLIC OF SENEGAL.
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A:DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A:DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B:ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A:DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B:ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A:DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B:ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A:DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B:ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:THE ECOWAS POPULATION
2ND TARGET:REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:TWENTY-FIVE (25)
NUMBER OF HANGARS:FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:TEN (10)
NUMBER OF FUEL FACILITIES:TWO (02)
NUMBER OF WAREHOUSES:TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:TWO (02)
NUMBER OF TRAINING FACILITIES:TEN (10)
NUMBER OF CATERING & DINING FACILITIES:TWO (02)
NUMBER OF PARKINGS:TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:FIVE (05)
NUMBER OF SUPPORT FACILITIES:FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:ONE HUNDRED (100)
NUMBER OF DORMITORIES:TEN (10)
NUMBER OF BUSINESS CENTERS:TEN (10)
NUMBER OF AVIATION FAIR AREA:TEN (10)
ANNEXED PROJECTS:
PROJECT NAME: VELINGARA AVIATION ACADEMY
TRADEMARK: VAA
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME: ZIGUINCHOR AERONAUTICAL UNIVERSITY
TRADEMARK: ZAU
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
SEVENTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: SEDHIOU ARUSHA INTERNATIONAL AIRPORT
TRADEMARK: SARIA
TYPE:22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: ARUSHA, UNITED REPUBLIC OF TANZANIA.
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS: TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A:DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A:DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B:ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A:DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B:ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A:DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B:ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A:DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B:ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:THE ECOWAS POPULATION
2ND TARGET:REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:TWENTY-FIVE (25)
NUMBER OF HANGARS:FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:TEN (10)
NUMBER OF FUEL FACILITIES:TWO (02)
NUMBER OF WAREHOUSES:TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:TWO (02)
NUMBER OF TRAINING FACILITIES:TEN (10)
NUMBER OF CATERING & DINING FACILITIES:TWO (02)
NUMBER OF PARKINGS:TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:FIVE (05)
NUMBER OF SUPPORT FACILITIES:FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:ONE HUNDRED (100)
NUMBER OF DORMITORIES:TEN (10)
NUMBER OF BUSINESS CENTERS:TEN (10)
NUMBER OF AVIATION FAIR AREA:TEN (10)
ANNEXED PROJECTS:
PROJECT NAME: GABOU AVIATION ACADEMY
TRADEMARK: GAA
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME: FOULADOU AERONAUTICAL UNIVERSITY
TRADEMARK: FAU
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
eighth MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: PAKAO CAPE INTERNATIONAL AIRPORT
TRADEMARK: PACIA
TYPE:22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: CAPE TOWN, REPUBLIC OF SOUTH AFRICA.
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS: TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A:DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A:DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B:ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A:DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B:ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A:DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B:ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A:DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B:ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:THE ECOWAS POPULATION
2ND TARGET:REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:TWENTY-FIVE (25)
NUMBER OF HANGARS:FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:TEN (10)
NUMBER OF FUEL FACILITIES:TWO (02)
NUMBER OF WAREHOUSES:TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:TWO (02)
NUMBER OF TRAINING FACILITIES:TEN (10)
NUMBER OF CATERING & DINING FACILITIES:TWO (02)
NUMBER OF PARKINGS:TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:FIVE (05)
NUMBER OF SUPPORT FACILITIES:FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:ONE HUNDRED (100)
NUMBER OF DORMITORIES:TEN (10)
NUMBER OF BUSINESS CENTERS:TEN (10)
NUMBER OF AVIATION FAIR AREA:TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:WALO AVIATION ACADEMY
TRADEMARK:WAA
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:SINE SALOUM AERONAUTICAL UNIVERSITY
TRADEMARK:SAU
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
NINTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME:TERANGA KITUI INTERNATIONAL AIRPORT
TRADEMARK:TEKIA
TYPE:22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION:KITUI, REPUBLIC OF SOUTH KENYA.
LAND AREA:EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A:DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A:DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B:ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A:DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B:ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A:DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B:ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A:DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B:ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:THE ECOWAS POPULATION
2ND TARGET:REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:TWENTY-FIVE (25)
NUMBER OF HANGARS:FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:TEN (10)
NUMBER OF FUEL FACILITIES:TWO (02)
NUMBER OF WAREHOUSES:TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:TWO (02)
NUMBER OF TRAINING FACILITIES:TEN (10)
NUMBER OF CATERING & DINING FACILITIES:TWO (02)
NUMBER OF PARKINGS:TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:FIVE (05)
NUMBER OF SUPPORT FACILITIES:FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:
ONE HUNDRED (100)
NUMBER OF DORMITORIES:TEN (10)
NUMBER OF BUSINESS CENTERS:TEN (10)
NUMBER OF AVIATION FAIR AREA:TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:DJOLOF AVIATION ACADEMY
TRADEMARK:DAA
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:KAYOR AERONAUTICAL UNIVERSITY
TRADEMARK:KAU
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
TENTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME:MOUSSOU KOUTA TRAORE INTERNATIONAL AIRPORT
TRADEMARK:MKTIA
TYPE:22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION:KAYES, REPUBLIC OF MALI.
LAND AREA:EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A:DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A:DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B:ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A:DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B:ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A:DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B:ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A:DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B:ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:THE ECOWAS POPULATION
2ND TARGET:REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:TWENTY-FIVE (25)
NUMBER OF HANGARS:FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:TEN (10)
NUMBER OF FUEL FACILITIES:TWO (02)
NUMBER OF WAREHOUSES:TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:TWO (02)
NUMBER OF TRAINING FACILITIES:TEN (10)
NUMBER OF CATERING & DINING FACILITIES:TWO (02)
NUMBER OF PARKINGS:TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:FIVE (05)
NUMBER OF SUPPORT FACILITIES:FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:ONE HUNDRED (100)
NUMBER OF DORMITORIES:TEN (10)
NUMBER OF BUSINESS CENTERS:TEN (10)
NUMBER OF AVIATION FAIR AREA:TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:KARANTABA AVIATION ACADEMY
TRADEMARK:KAA
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:BAFING AERONAUTICAL UNIVERSITY
TRADEMARK:BAU
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS
ELEVENTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME:ALIOU BASSOUTI SAGNA INTERNATIONAL AIRPORT
TRADEMARK:ABSIA
TYPE:22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION:MOXICO, REPUBLIC OF ANGOLA.
LAND AREA:EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A:DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A:DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B:ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A:DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B:ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A:DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B:ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A:DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B:ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:THE SADC POPULATION
2ND TARGET:REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:TWENTY-FIVE (25)
NUMBER OF HANGARS:FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:TEN (10)
NUMBER OF FUEL FACILITIES:TWO (02)
NUMBER OF WAREHOUSES:TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:TWO (02)
NUMBER OF TRAINING FACILITIES:TEN (10)
NUMBER OF CATERING & DINING FACILITIES:TWO (02)
NUMBER OF PARKINGS:TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:FIVE (05)
NUMBER OF SUPPORT FACILITIES:FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:ONE HUNDRED (100)
NUMBER OF DORMITORIES: TEN (10)
NUMBER OF BUSINESS CENTERS:TEN (10)
NUMBER OF AVIATION FAIR AREA:TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:SEDHIOU AVIATION ACADEMY
TRADEMARK:SAA
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:CASAMANCE AERONAUTICAL UNIVERSITY
TRADEMARK:CAU
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
TWELFTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME:TERANGA INDIA INTERNATIONAL AIRPORT
TRADEMARK:TERIA
TYPE:22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION:RAJASTHAN, REPUBLIC OF INDIA.
LAND AREA:EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A:DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A:DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B:ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A:DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B:ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A:DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B:ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A:DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B:ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:INDIAN POPULATION
2ND TARGET:REST OF SOUTH ASIA’S POPULATION.
NUMBER OF RUNAWAYS:SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:TWENTY-FIVE (25)
NUMBER OF HANGARS:FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:TEN (10)
NUMBER OF FUEL FACILITIES:TWO (02)
NUMBER OF WAREHOUSES:TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:TWO (02)
NUMBER OF TRAINING FACILITIES:TEN (10)
NUMBER OF CATERING & DINING FACILITIES:TWO (02)
NUMBER OF PARKINGS:TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:FIVE (05)
NUMBER OF SUPPORT FACILITIES:FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:ONE HUNDRED (100)
NUMBER OF DORMITORIES:TEN (10)
NUMBER OF BUSINESS CENTERS:TEN (10)
NUMBER OF AVIATION FAIR AREA:TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:RABBAL AVIATION ACADEMY
TRADEMARK:RAA
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:LATEEF AERONAUTICAL UNIVERSITY
TRADEMARK:LAU
LAND AREA:TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
THIRTEENTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: MAMA DABO MANTOL INTERNATIONAL AIRPORT
TRADEMARK: MDMIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: DAKHLA-OUED ED-DAHAB, KINGDOM OF MOROCCO
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1)
TERMINAL 1A:
DEPARTURES OF INTERCONTINENTAL FLIGHTS
2)
TERMINAL 1B:
ARRIVALS OF INTERCONTINENTAL FLIGHTS
3)
TERMINAL 2A:
DEPARTURES FOR INTERNATIONAL FLIGHTS
4)
TERMINAL 2B:
ARRIVALS FOR INTERNATIONAL FLIGHTS
5)
TERMINAL 3A:
DEPARTURES FOR DOMESTIC FLIGHTS
6)
TERMINAL 3B:
ARRIVALS FOR DOMESTIC FLIGHTS
7)
TERMINAL 4A:
DEPARTURES FOR CARGO FLIGHTS
8)
TERMINAL 4B:
ARRIVALS FOR CARGO FLIGHTS
9)
TERMINAL 5A:
DEPARTURES FOR VIP & OFFICIALS
10)
TERMINAL 5B:
ARRIVALS FOR VIP & OFFICIALS
11)
AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:
THE NORTHERN AFRICAN POPULATION
2ND TARGET:
REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:
SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:
TWENTY-FIVE (25)
NUMBER OF HANGARS:
FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:
FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:
TEN (10)
NUMBER OF FUEL FACILITIES:
TWO (02)
NUMBER OF WAREHOUSES:
TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:
FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:
FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:
FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:
TWO (02)
NUMBER OF TRAINING FACILITIES:
TEN (10)
NUMBER OF CATERING & DINING FACILITIES:
TWO (02)
NUMBER OF PARKINGS:
TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:
FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:
FIVE (05)
NUMBER OF SUPPORT FACILITIES:
FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:
ONE HUNDRED (100)
NUMBER OF DORMITORIES:
TEN (10)
NUMBER OF BUSINESS CENTERS:
TEN (10)
NUMBER OF AVIATION FAIR AREA:
TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:
ELINKIN AVIATION ACADEMY
TRADEMARK:
EAA
LAND AREA:
TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:
PAOSKOTO AERONAUTICAL UNIVERSITY
TRADEMARK:
PAU
LAND AREA:
TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
FOURTEENTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: MALANG ALIOU SAGNA INTERNATIONAL AIRPORT
TRADEMARK: MASIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: WOLEU-NTEM, REPUBLIC OF GABON
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:
TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1)
TERMINAL 1A:
DEPARTURES OF INTERCONTINENTAL FLIGHTS
2)
TERMINAL 1B:
ARRIVALS OF INTERCONTINENTAL FLIGHTS
3)
TERMINAL 2A:
DEPARTURES FOR INTERNATIONAL FLIGHTS
4)
TERMINAL 2B:
ARRIVALS FOR INTERNATIONAL FLIGHTS
5)
TERMINAL 3A:
DEPARTURES FOR DOMESTIC FLIGHTS
6)
TERMINAL 3B:
ARRIVALS FOR DOMESTIC FLIGHTS
7)
TERMINAL 4A:
DEPARTURES FOR CARGO FLIGHTS
8)
TERMINAL 4B:
ARRIVALS FOR CARGO FLIGHTS
9)
TERMINAL 5A:
DEPARTURES FOR VIP & OFFICIALS
10)
TERMINAL 5B:
ARRIVALS FOR VIP & OFFICIALS
11)
AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:
THE CENTRAL AFRICA POPULATION
2ND TARGET:
REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:
SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:
TWENTY-FIVE (25)
NUMBER OF HANGARS:
FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:
FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:
TEN (10)
NUMBER OF FUEL FACILITIES:
TWO (02)
NUMBER OF WAREHOUSES:
TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:
FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:
FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:
FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:
TWO (02)
NUMBER OF TRAINING FACILITIES:
TEN (10)
NUMBER OF CATERING & DINING FACILITIES:
TWO (02)
NUMBER OF PARKINGS:
TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:
FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:
FIVE (05)
NUMBER OF SUPPORT FACILITIES:
FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:
ONE HUNDRED (100)
NUMBER OF DORMITORIES:
TEN (10)
NUMBER OF BUSINESS CENTERS:
TEN (10)
NUMBER OF AVIATION FAIR AREA:
TEN (10)
ANNEXED PROJECTS:
PROJECT NAME: OUROSSOGUI AVIATION ACADEMY
TRADEMARK: OAA
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME: OUSSOUYE AERONAUTICAL UNIVERSITY
TRADEMARK: OAU
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
FIFTEENTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: KHADIJA AMADOU BA INTERNATIONAL AIRPORT
TRADEMARK: KABIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: PITA, REPUBLIC OF GUINEA
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS: TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1)
TERMINAL 1A:
DEPARTURES OF INTERCONTINENTAL FLIGHTS
2)
TERMINAL 1B:
ARRIVALS OF INTERCONTINENTAL FLIGHTS
3)
TERMINAL 2A:
DEPARTURES FOR INTERNATIONAL FLIGHTS
4)
TERMINAL 2B:
ARRIVALS FOR INTERNATIONAL FLIGHTS
5)
TERMINAL 3A:
DEPARTURES FOR DOMESTIC FLIGHTS
6)
TERMINAL 3B:
ARRIVALS FOR DOMESTIC FLIGHTS
7)
TERMINAL 4A:
DEPARTURES FOR CARGO FLIGHTS
8)
TERMINAL 4B:
ARRIVALS FOR CARGO FLIGHTS
9)
TERMINAL 5A:
DEPARTURES FOR VIP & OFFICIALS
10)
TERMINAL 5B:
ARRIVALS FOR VIP & OFFICIALS
11)
AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:
THE WESTERN AFRICA POPULATION
2ND TARGET:
REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:
SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:
TWENTY-FIVE (25)
NUMBER OF HANGARS:
FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:
FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:
TEN (10)
NUMBER OF FUEL FACILITIES:
TWO (02)
NUMBER OF WAREHOUSES:
TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:
FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:
FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:
FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:
TWO (02)
NUMBER OF TRAINING FACILITIES:
TEN (10)
NUMBER OF CATERING & DINING FACILITIES:
TWO (02)
NUMBER OF PARKINGS:
TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:
FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:
FIVE (05)
NUMBER OF SUPPORT FACILITIES:
FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:
ONE HUNDRED (100)
NUMBER OF DORMITORIES:
TEN (10)
NUMBER OF BUSINESS CENTERS:
TEN (10)
NUMBER OF AVIATION FAIR AREA:
TEN (10)
ANNEXED PROJECTS:
PROJECT NAME: DAKAR AVIATION ACADEMY
TRADEMARK: DAA
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME: CONAKRY AERONAUTICAL UNIVERSITY
TRADEMARK: CAU
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
SIXTEENTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: SEYDINA OMAR NDIAYE INTERNATIONAL AIRPORT
TRADEMARK: SONIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: KINSHASA, DEMOCRATIC REPUBLIC OF CONGO
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:
TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1)
TERMINAL 1A:
DEPARTURES OF INTERCONTINENTAL FLIGHTS
2)
TERMINAL 1B:
ARRIVALS OF INTERCONTINENTAL FLIGHTS
3)
TERMINAL 2A:
DEPARTURES FOR INTERNATIONAL FLIGHTS
4)
TERMINAL 2B:
ARRIVALS FOR INTERNATIONAL FLIGHTS
5)
TERMINAL 3A:
DEPARTURES FOR DOMESTIC FLIGHTS
6)
TERMINAL 3B:
ARRIVALS FOR DOMESTIC FLIGHTS
7)
TERMINAL 4A:
DEPARTURES FOR CARGO FLIGHTS
8)
TERMINAL 4B:
ARRIVALS FOR CARGO FLIGHTS
9)
TERMINAL 5A:
DEPARTURES FOR VIP & OFFICIALS
10)
TERMINAL 5B:
ARRIVALS FOR VIP & OFFICIALS
11)
AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:
THE CENTRAL AFRICA POPULATION
2ND TARGET:
REST OF AFRICA’S POPULATION.
NUMBER OF RUNAWAYS:
SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:
TWENTY-FIVE (25)
NUMBER OF HANGARS:
FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:
FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:
TEN (10)
NUMBER OF FUEL FACILITIES:
TWO (02)
NUMBER OF WAREHOUSES:
TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:
FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:
FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:
FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:
TWO (02)
NUMBER OF TRAINING FACILITIES:
TEN (10)
NUMBER OF CATERING & DINING FACILITIES:
TWO (02)
NUMBER OF PARKINGS:
TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:
FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:
FIVE (05)
NUMBER OF SUPPORT FACILITIES:
FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:
ONE HUNDRED (100)
NUMBER OF DORMITORIES:
TEN (10)
NUMBER OF BUSINESS CENTERS:
TEN (10)
NUMBER OF AVIATION FAIR AREA:
TEN (10)
ANNEXED PROJECTS:
PROJECT NAME: PAKAO AVIATION ACADEMY
TRADEMARK: PAA
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME: LINGUERE AERONAUTICAL UNIVERSITY
TRADEMARK: CAU
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
SEVENTEENTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: PAKAO BOLIVARIAN INTERNATIONAL AIRPORT
TRADEMARK: PABIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: FALCON STATE, NORTHWEST OF THE BOLIVARIAN REPUBLIC OF VENEZUELA
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:
TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1) TERMINAL 1A: DEPARTURES OF INTERCONTINENTAL FLIGHTS
2) TERMINAL 1B: ARRIVALS OF INTERCONTINENTAL FLIGHTS
3) TERMINAL 2A: DEPARTURES FOR INTERNATIONAL FLIGHTS
4) TERMINAL 2B: ARRIVALS FOR INTERNATIONAL FLIGHTS
5) TERMINAL 3A: DEPARTURES FOR DOMESTIC FLIGHTS
6) TERMINAL 3B: ARRIVALS FOR DOMESTIC FLIGHTS
7) TERMINAL 4A: DEPARTURES FOR CARGO FLIGHTS
8) TERMINAL 4B: ARRIVALS FOR CARGO FLIGHTS
9) TERMINAL 5A: DEPARTURES FOR VIP & OFFICIALS
10) TERMINAL 5B: ARRIVALS FOR VIP & OFFICIALS
11) AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:
THE LATIN AMERICAN POPULATION
2ND TARGET:
REST OF AMERICAS POPULATION.
NUMBER OF RUNAWAYS:
SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:
TWENTY-FIVE (25)
NUMBER OF HANGARS:
FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:
FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:
TEN (10)
NUMBER OF FUEL FACILITIES:
TWO (02)
NUMBER OF WAREHOUSES:
TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:
FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:
FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:
FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:
TWO (02)
NUMBER OF TRAINING FACILITIES:
TEN (10)
NUMBER OF CATERING & DINING FACILITIES:
TWO (02)
NUMBER OF PARKINGS:
TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:
FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:
FIVE (05)
NUMBER OF SUPPORT FACILITIES:
FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:
ONE HUNDRED (100)
NUMBER OF DORMITORIES:
TEN (10)
NUMBER OF BUSINESS CENTERS:
TEN (10)
NUMBER OF AVIATION FAIR AREA:
TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:
VELINGARA AVIATION ACADEMY
TRADEMARK:
VAA
LAND AREA:
TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:
BOUNDOU AERONAUTICAL UNIVERSITY
TRADEMARK:
BAU
LAND AREA:
TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
EIGHTEENTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION:
PROJECT NAME: PAKAO DOMINICAN INTERNATIONAL AIRPORT
TRADEMARK: PADIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: SAN JUAN PROVINCE, DOMINICAN REPUBLIC
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS:
TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1)
TERMINAL 1A:
DEPARTURES OF INTERCONTINENTAL FLIGHTS
2)
TERMINAL 1B:
ARRIVALS OF INTERCONTINENTAL FLIGHTS
3)
TERMINAL 2A:
DEPARTURES FOR INTERNATIONAL FLIGHTS
4)
TERMINAL 2B:
ARRIVALS FOR INTERNATIONAL FLIGHTS
5)
TERMINAL 3A:
DEPARTURES FOR DOMESTIC FLIGHTS
6)
TERMINAL 3B:
ARRIVALS FOR DOMESTIC FLIGHTS
7)
TERMINAL 4A:
DEPARTURES FOR CARGO FLIGHTS
8)
TERMINAL 4B:
ARRIVALS FOR CARGO FLIGHTS
9)
TERMINAL 5A:
DEPARTURES FOR VIP & OFFICIALS
10)
TERMINAL 5B:
ARRIVALS FOR VIP & OFFICIALS
11)
AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:
THE CARIBBEAN POPULATION
2ND TARGET:
REST OF CENTRAL AMERICA’S POPULATION.
NUMBER OF RUNAWAYS:
SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:
TWENTY-FIVE (25)
NUMBER OF HANGARS:
FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:
FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:
TEN (10)
NUMBER OF FUEL FACILITIES:
TWO (02)
NUMBER OF WAREHOUSES:
TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:
FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:
FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:
FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:
TWO (02)
NUMBER OF TRAINING FACILITIES:
TEN (10)
NUMBER OF CATERING & DINING FACILITIES:
TWO (02)
NUMBER OF PARKINGS:
TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:
FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:
FIVE (05)
NUMBER OF SUPPORT FACILITIES:
FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:
ONE HUNDRED (100)
NUMBER OF DORMITORIES:
TEN (10)
NUMBER OF BUSINESS CENTERS:
TEN (10)
NUMBER OF AVIATION FAIR AREA:
TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:
GABOU AVIATION ACADEMY
TRADEMARK:
GAA
LAND AREA:
TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:
MANDE AERONAUTICAL UNIVERSITY
TRADEMARK:
MAU
LAND AREA:
TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
NINTEENTH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: PAKAO LATINO INTERNATIONAL AIRPORT
TRADEMARK: PALIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: BAHIA, NORTHEAST OF THE FEDERAL REPUBLIC OF BRAZIL
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS: TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1)
TERMINAL 1A:
DEPARTURES OF INTERCONTINENTAL FLIGHTS
2)
TERMINAL 1B:
ARRIVALS OF INTERCONTINENTAL FLIGHTS
3)
TERMINAL 2A:
DEPARTURES FOR INTERNATIONAL FLIGHTS
4)
TERMINAL 2B:
ARRIVALS FOR INTERNATIONAL FLIGHTS
5)
TERMINAL 3A:
DEPARTURES FOR DOMESTIC FLIGHTS
6)
TERMINAL 3B:
ARRIVALS FOR DOMESTIC FLIGHTS
7)
TERMINAL 4A:
DEPARTURES FOR CARGO FLIGHTS
8)
TERMINAL 4B:
ARRIVALS FOR CARGO FLIGHTS
9)
TERMINAL 5A:
DEPARTURES FOR VIP & OFFICIALS
10)
TERMINAL 5B:
ARRIVALS FOR VIP & OFFICIALS
11)
AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:
THE CARIBBEAN POPULATION
2ND TARGET:
REST OF CENTRAL AMERICA’S POPULATION.
NUMBER OF RUNAWAYS:
SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:
TWENTY-FIVE (25)
NUMBER OF HANGARS:
FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:
FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:
TEN (10)
NUMBER OF FUEL FACILITIES:
TWO (02)
NUMBER OF WAREHOUSES:
TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:
FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:
FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:
FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:
TWO (02)
NUMBER OF TRAINING FACILITIES:
TEN (10)
NUMBER OF CATERING & DINING FACILITIES:
TWO (02)
NUMBER OF PARKINGS:
TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:
FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:
FIVE (05)
NUMBER OF SUPPORT FACILITIES:
FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:
ONE HUNDRED (100)
NUMBER OF DORMITORIES:
TEN (10)
NUMBER OF BUSINESS CENTERS:
TEN (10)
NUMBER OF AVIATION FAIR AREA:
TEN (10)
ANNEXED PROJECTS:
PROJECT NAME: TEKROUR AVIATION ACADEMY
TRADEMARK: TAA
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME: KADIOR AERONAUTICAL UNIVERSITY
TRADEMARK: KAU
LAND AREA: TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.
TWENTIETH MEGA AIRPORT PROJECT BRIEF DESCRIPTION
PROJECT NAME: SEDHIOU GULF INTERNATIONAL AIRPORT
TRADEMARK: SEGIA
TYPE: 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL AIRPORT ANNEXED WITH AVIATION ACADEMY AND AERONAUTICAL UNIVERSITY
LOCATION: SALALAH, SULTANATE OF OMAN
LAND AREA: EIGHT THOUSANDS (8,000) HECTARES
NUMBER OF TERMINALS: TEN (10) + ONE (01) AIR FORCE BASE.
CONFIGURATION OF TERMINALS:
1)
TERMINAL 1A:
DEPARTURES OF INTERCONTINENTAL FLIGHTS
2)
TERMINAL 1B:
ARRIVALS OF INTERCONTINENTAL FLIGHTS
3)
TERMINAL 2A:
DEPARTURES FOR INTERNATIONAL FLIGHTS
4)
TERMINAL 2B:
ARRIVALS FOR INTERNATIONAL FLIGHTS
5)
TERMINAL 3A:
DEPARTURES FOR DOMESTIC FLIGHTS
6)
TERMINAL 3B:
ARRIVALS FOR DOMESTIC FLIGHTS
7)
TERMINAL 4A:
DEPARTURES FOR CARGO FLIGHTS
8)
TERMINAL 4B:
ARRIVALS FOR CARGO FLIGHTS
9)
TERMINAL 5A:
DEPARTURES FOR VIP & OFFICIALS
10)
TERMINAL 5B:
ARRIVALS FOR VIP & OFFICIALS
11)
AIR FORCE BASE (DEPARTURES & ARRIVALS) FOR THE NATIONAL DEFENSE AND SECURITY FORCES
EXPECTED NUMBER OF PASSENGERS PER ANNUM:
FROM FIFTY MILLIONS (50,000,000) UP TO TWO HUNDRED AND FIFTY MILLION (250,000, 000) P.A
1ST TARGET:
THE GCC MEMBER-STATES
2ND TARGET:
REST OF THE MIDDLE EASTERN POPULATION.
NUMBER OF RUNAWAYS:
SIX (06)
NUMBER OF MAINTENANCE CENTERS FOR ALL SPECIALITIES:
TWENTY-FIVE (25)
NUMBER OF HANGARS:
FIFTY (50)
NUMBER OF BUILDINGS FOR CUSTOMS OFFICIALS:
FIVE (05)
NUMBER OF SUBWAYS & TRANSPORTATION FACILITIES:
TEN (10)
NUMBER OF FUEL FACILITIES:
TWO (02)
NUMBER OF WAREHOUSES:
TEN (10)
NUMBER OF AIRPORT MEDICAL CENTERS:
FIVE (05)
NUMBER OF AIRPORT LUXURY HOTELS:
FIVE (05)
NUMBER OF RELIGIOUS FACILITIES PER TERMINAL:
FIVE (05)
NUMBER OF AIR TRAFFIC CONTROL TOWERS:
TWO (02)
NUMBER OF TRAINING FACILITIES:
TEN (10)
NUMBER OF CATERING & DINING FACILITIES:
TWO (02)
NUMBER OF PARKINGS:
TEN (10)
NUMBER OF SECURITY FORCES BUILDINGS:
FIVE (05)
NUMBER OF FIRE FIGHTING FACILITIES:
FIVE (05)
NUMBER OF SUPPORT FACILITIES:
FIVE (05)
NUMBER OF AVIATION TECHNOPARK PER TERMINAL:
ONE HUNDRED (100)
NUMBER OF DORMITORIES:
TEN (10)
NUMBER OF BUSINESS CENTERS:
TEN (10)
NUMBER OF AVIATION FAIR AREA:
TEN (10)
ANNEXED PROJECTS:
PROJECT NAME:
WALO AVIATION ACADEMY
TRADEMARK:
WAA
LAND AREA:
TWO HUNDRED AND FIFTY (250) HECTARES
PROJECT NAME:
FOUTA AERONAUTICAL UNIVERSITY
TRADEMARK:
FAU
LAND AREA:
TWO HUNDRED AND FIFTY (250) HECTARES
AND OTHER AIR TRANSPORTATION STRATEGIC EQUIPMENTS.