GIGANTIC Projects
INTERNATIONAL tenders
FIRST LOI AND QUOTATIONS TO BE ISSUED BY QUALIFIED AAA AND AA RATED GLOBAL CONTRACTORS FOR THE FOLLOWING REAL ESTATE INFRASTRUCTURES SHALL BE ADDRESSED:
TO:
MVP FOUNDATIONS INTERCONTINENTAL DEVELOPMENT INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
A1-
PROJECT NAME:
TERANGA BANKING CENTER
SHORT NAME:
TBC TOWERS
TOTAL BUILT-IN AREA PER PROJECT:
1,368,000 SQUARE METERS
QUANTITY:
14
A2-
PROJECT NAME:
PAKAO FINANCIAL CENTER
SHORT NAME:
PFC TOWERS
TOTAL BUILT-IN AREA PER PROJECT:
1,170,000 SQUARE METERS
QUANTITY:
14
SECOND LOI AND QUOTATIONS TO BE ISSUED BY THE AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING REAL ESTATE INFRASTRUCTURES SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
Bq-
PROJECT NAME:
SUBHANALLAH TOWERS
SHORT NAME:
ST25 TOWERS
TOTAL BUILT-IN AREA PER PROJECT:
398,000 SQUARE METERS
QUANTITY:
644
B2-
PROJECT NAME:
ALHAMDULILLAH TOWERS
SHORT NAME:
HT25 TOWERS
TOTAL BUILT-IN AREA PER PROJECT:
398,000 SQUARE METERS
QUANTITY:
644
THIRD LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING REAL ESTATE INFRASTRUCTURES SHALL BE ADDRESSED:
TO:
MVP FOUNDATIONS INTERCONTINENTAL DEVELOPMENT INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
C1-
PROJECT NAME:
BANI ADAM TOWERS
SHORT NAME:
BA46 TOWERS
TOTAL BUILT-IN AREA PER PROJECT:
1,008,000 SQUARE METERS
QUANTITY:
40
C2-
PROJECT NAME:
LIYA BUDUN TOWERS
SHORT NAME:
LB46 TOWERS
TOTAL BUILT-IN AREA PER PROJECT:
1,008,000 SQUARE METERS
QUANTITY:
40
FOURTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL METROPOLITAN SMART CITIES SHALL BE ADDRESSED:
TO:
MVP FOUNDATIONS INTERCONTINENTAL DEVELOPMENT INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
D1-
PROJECT NAME:
WORLD FINANCIAL CAPITAL
SHORT NAME:
WFC
D2-
PROJECT NAME:
WORLD DIPLOMATIC CAPITAL
SHORT NAME:
WDC
D3-
PROJECT NAME:
WORLD BUSINESS CAPITAL
SHORT NAME:
WBC
D4-
PROJECT NAME:
WORLD TRADE CAPITAL
SHORT NAME:
WTC
D5-
PROJECT NAME:
WORLD ECONOMIC CAPITAL
SHORT NAME:
WEC
D6-
PROJECT NAME:
WORLD PEACE CAPITAL
SHORT NAME:
WPC
D7-
PROJECT NAME:
WORLD UNITY CAPITAL
SHORT NAME:
WUC
D8-
PROJECT NAME:
WORLD MERCY CAPITAL
SHORT NAME:
WMC
D9-
PROJECT NAME:
WORLD HERITAGE CAPITAL
SHORT NAME:
WHC
D10-
PROJECT NAME:
WORLD GRACE CAPITAL
SHORT NAME:
WGC
LAND AREA PER SMART CITY:
FIVE THOUSAND HECTARES (5,000HA).
TOTAL LAND AREA FOR THE TEN (10) SMART CITIES:
FIFTY THOUSAND HECTARES (50,000HA).
PROJECTS LOCATION:
REPUBLIC OF SENEGAL
FIFTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN FUTURISTIC SMART INTERNATIONAL AIRPORTS SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
E1-
PROJECT NAME:
COUMBA ANSOU CISSE INTERNATIONAL AIRPORT
SHORT NAME:
CACIA
PROJECT LOCATION:
SEDHIOU, SENEGAL
E2-
PROJECT NAME:
BACARY DEMBA SIDY NDIAYE INTERNATIONAL AIRPORT
SHORT NAME:
BDSNIA
PROJECT LOCATION:
KEDOUGOU, SENEGAL
E3-
PROJECT NAME:
ELHADJ OUMAR TALL INTERNATIONAL AIRPORT
SHORT NAME:
HOTIA
PROJECT LOCATION:
BAKEL, SENEGAL
E4-
PROJECT NAME:
ELHADJ MALICK SY INTERNATIONAL AIRPORT
SHORT NAME:
EMSIA
PROJECT LOCATION:
SAINT-LOUIS, SENEGAL
E5-
PROJECT NAME:
CHEIKH AHMADOU BAMBA INTERNATIONAL AIRPORT
SHORT NAME:
CABIA
PROJECT LOCATION:
DIOURBEL, SENEGAL
E6-
PROJECT NAME:
TAMARTA MASSALY INTERNATIONAL AIRPORT
SHORT NAME:
TAMIA
PROJECT LOCATION:
TAMBACOUNDA, SENEGAL
E7-
PROJECT NAME:
PAKAO CAPE INTERNATIONAL AIRPORT
SHORT NAME:
PACIA
PROJECT LOCATION:
WESTERN CAPE, SOUTH AFRICA
E8-
PROJECT NAME:
TERANGA KITUI INTERNATIONAL AIRPORT
SHORT NAME:
TEKIA
PROJECT LOCATION:
KITUI, KENYA
E9-
PROJECT NAME:
SEDHIOU ARUSHA INTERNATIONAL AIRPORT
SHORT NAME:
SARIA
PROJECT LOCATION:
ARUSHA, TANZANIA
E10-
PROJECT NAME:
ALIOU BASSOUTI SAGNA INTERNATIONAL AIRPORT
SHORT NAME:
ABSIA
PROJECT LOCATION:
MOXICO, ANGOLA
E11-
PROJECT NAME:
TERANGA INDIA INTERNATIONAL AIRPORT
SHORT NAME:
TERIA
PROJECT LOCATION:
RAJASTHAN, INDIA
E12-
PROJECT NAME:
MOUSSOU KOUTA TRAORE INTERNATIONAL AIRPORT
SHORT NAME:
MKTIA
PROJECT LOCATION:
KAYES, MALI
E13-
PROJECT NAME:
MAMA DABO MANTOL INTERNATIONAL AIRPORT
SHORT NAME:
MDMIA
PROJECT LOCATION:
DAKHLA-OUED ED-DAHAB, MOROCCO
E14-
PROJECT NAME:
MALANG ALIOU SAGNA INTERNATIONAL AIRPORT
SHORT NAME:
MASIA
PROJECT LOCATION:
WOLEU-NTEM, GABON
E15-
PROJECT NAME:
KHADIJA AMADOU BA INTERNATIONAL AIRPORT
SHORT NAME:
KABIA
PROJECT LOCATION:
PITA, GUINEA-CONAKRY
E16-
PROJECT NAME:
SEYDINA OMAR NDIAYE INTERNATIONAL AIRPORT
SHORT NAME:
SONIA
PROJECT LOCATION:
KINSHASA, D.R CONGO
LAND AREA PER INTERNATIONAL AIRPORT:
EIGHT THOUSAND HECTARES (8,000HA).
TOTAL LAND AREA FOR THE SIXTEEN (16) INTERNATIONAL AIRPORTS:
ONE HUNDRED AND TWENTY-EIGHT THOUSAND HECTARES (128,000HA).
SIXTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL METROPOLITAN SMART CITIES OR MEGALOPOLIS SHALL BE ADDRESSED:
TO:
MVP FOUNDATIONS INTERCONTINENTAL DEVELOPMENT INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
F1-
PROJECT NAME:
PRINCE PAKAO PARADISE
SHORT NAME:
PPP
PROJECT LOCATION:
TAMBACOUNDA, SENEGAL
F2-
PROJECT NAME:
TERANGA IMPERIAL CITY
SHORT NAME:
TIC
PROJECT LOCATION:
WESTERN CAPE, SOUTH AFRICA
F3-
PROJECT NAME:
PAKAO IMPERIAL CITY
SHORT NAME:
PIC
PROJECT LOCATION:
KITUI, KENYA
F4-
PROJECT NAME:
MANDINKA IMPERIAL CITY
SHORT NAME:
MIC
PROJECT LOCATION:
ARUSHA, TANZANIA
F5-
PROJECT NAME:
GABOU IMPERIAL CITY
SHORT NAME:
GIC
PROJECT LOCATION:
MOXICO, ANGOLA
F6-
PROJECT NAME:
DJOLOF EMPIRE CITY
SHORT NAME:
DEC
PROJECT LOCATION:
RAJASTHAN, INDIA
F7-
PROJECT NAME:
BAMBARA IMPERIAL CITY
SHORT NAME:
BIC
PROJECT LOCATION:
KAYES, MALI
F8-
PROJECT NAME:
CASAMANCE IMPERIAL CITY
SHORT NAME:
CIC
PROJECT LOCATION:
DAKHLA-OUED ED-DAHAB, MOROCCO
F9-
PROJECT NAME:
SEDHIOU IMPERIAL CITY
SHORT NAME:
SIC
PROJECT LOCATION:
WOLEU-NTEM, GABON
F10-
PROJECT NAME:
FOUTA IMPERIAL CITY
SHORT NAME:
FIC
PROJECT LOCATION:
KINSHASA, GUINEA-CONAKRY
F11-
PROJECT NAME:
NDIAMBOUR IMPERIAL CITY
SHORT NAME:
NIC
PROJECT LOCATION:
KINSHASA, D.R CONGO
LAND AREA PER MEGALOPOLIS:
SEVENTY THOUSAND HECTARES (70,000HA).
TOTAL LAND AREA FOR THE ELEVEN (11) INTERNATIONAL SMART MEGALOPOLIS:
SEVEN HUNDRED AND SEVENTY THOUSAND HECTARES (770,000HA).
SEVENTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN FUTURISTIC SMART GLOBAL SEAPORTS SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
G1-
PROJECT NAME:
GLOBAL ATLANTIC PORT
SHORT NAME:
GAP
PROJECT LOCATION:
LOMPOUL, SENEGAL
G2-
PROJECT NAME:
MEGA ATLANTIC PORT
SHORT NAME:
MAP
PROJECT LOCATION:
PALMARIN, SENEGAL
G3-
PROJECT NAME:
TERA ATLANTIC PORT
SHORT NAME:
TAP
PROJECT LOCATION:
KAFOUNTINE, SENEGAL
G4-
PROJECT NAME:
SEDHIOU COMMERCIAL PORT
SHORT NAME:
SCP
PROJECT LOCATION:
SEDHIOU, SENEGAL
G5-
PROJECT NAME:
BAMBALI ATLANTIC PORT
SHORT NAME:
BAP
PROJECT LOCATION:
WESTERN CAPE, SOUTH AFRICA
G6-
PROJECT NAME:
VELINGARA ATLANTIC PORT
SHORT NAME:
VAP
PROJECT LOCATION:
LOBITO, ANGOLA
G7-
PROJECT NAME:
KARANTABA ATLANTIC PORT
SHORT NAME:
KARANTABA ATLANTIC PORT
PROJECT LOCATION:
MALINDI, KENYA
LAND AREA PER EACH ONE OF THE SIX (06) GLOBAL SEAPORTS (G1, G2, G3, G5 AND G7):
FIVE THOUSAND HECTARES (5,000HA).
LAND AREA FOR THE SEDHIOU COMMERCIAL PORT (SCP):
ONE THOUSAND HECTARES (1,000HA).
TOTAL LAND AREA FOR THE SEVEN (07) GLOBAL SEAPORTS:
THIRTY-ONE THOUSAND HECTARES (31,000HA).
EIGHTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL RESIDENTIAL SMART CITIES SHALL BE ADDRESSED:
TO:
MVP FOUNDATIONS INTERCONTINENTAL DEVELOPMENT INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
H1-
PROJECT NAME:
ROYAL PARADISE METROPOLE
SHORT NAME:
ROPAM
TOTAL LAND AREA PER PROJECT:
SEVEN THOUSAND AND FIVE HUNDRED HECTARES (7,500HA)
PROJECT LOCATION:
FORTY-ONE (41) DEPARTMENTS OF THE REPUBLIC OF SENEGAL
QUANTITY:
41
TOTAL LAND AREA OF THE FORTY-ONE (41) SMART RESIDENTIAL CITIES:
THREE HUNDRED SEVEN THOUSAND AND FIVE HUNDRED HECTARES (307,500HA)
NINTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC HOSPITALS SHALL BE ADDRESSED:
TO:
MVP FOUNDATIONS INTERCONTINENTAL DEVELOPMENT INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
H2-
PROJECT NAME:
PATRIOTIC PROVIDENTIAL HOSPITALS
SHORT NAME:
PPH
TOTAL LAND AREA PER PROJECT:
FIFTY HECTARES (50HA)
PROJECT LOCATION:
FORTY-SIX (46) DEPARTMENTS OF THE REPUBLIC OF SENEGAL
QUANTITY:
55
TOTAL LAND AREA OF THE FIFTY-FIVE (55) SMART FUTURISTIC HOSPITALS:
TWO THOUSAND SEVEN HUNDRED AND FIFTY HECTARES (2,750HA).
TENTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC MEDICAL CLUSTERS SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
H3-
PROJECT NAME:
MILLENNIUM MEDICAL CITY
SHORT NAME:
MMC
TOTAL LAND AREA PER PROJECT:
ONE THOUSAND HECTARES (1,000HA)
PROJECT LOCATION:
THIRTEEN (13) REGIONS IN THE REPUBLIC OF SENEGAL
QUANTITY:
13
TOTAL LAND AREA OF THE THIRTEEN (13) SMART FUTURISTIC MEDICAL CLUSTERS:
THIRTEEN THOUSAND HECTARES (13,000HA).
ELEVENTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC ACADEMIC CITIES SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
H4-
PROJECT NAME:
BRIGHT ACADEMIC CITY
SHORT NAME:
BAC
TOTAL LAND AREA PER PROJECT:
ONE THOUSAND HECTARES (1,000HA)
PROJECT LOCATION:
THIRTEEN (13) REGIONS IN THE REPUBLIC OF SENEGAL
QUANTITY:
13
TOTAL LAND AREA OF THE THIRTEEN (13) SMART FUTURISTIC ACADEMIC CITIES:
THIRTEEN THOUSAND HECTARES (13,000HA).
TWELFTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC OLYMPIC CITIES SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
H5-
PROJECT NAME:
MILLENNIUM OLYMPIC CITY
SHORT NAME:
MOC
TOTAL LAND AREA PER PROJECT:
ONE THOUSAND HECTARES (1,000HA)
PROJECT LOCATION:
THIRTEEN (13) REGIONS IN THE REPUBLIC OF SENEGAL
QUANTITY:
13
TOTAL LAND AREA OF THE THIRTEEN (13) SMART FUTURISTIC OLYMPIC CITIES:
THIRTEEN THOUSAND HECTARES (13,000HA).
THIRTEENTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC TELECOM CITIES SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
H7-
PROJECT NAME:
TERANGA TELECOM CITY
SHORT NAME:
TTC
TOTAL LAND AREA PER PROJECT:
ONE THOUSAND HECTARES (1,000HA)
PROJECT LOCATION:
THIRTEEN (13) REGIONS IN THE REPUBLIC OF SENEGAL
QUANTITY:
13
TOTAL LAND AREA OF THE THIRTEEN (13) SMART FUTURISTIC TELECOM CITIES:
THIRTEEN THOUSAND HECTARES (13,000HA).
FOURTEENTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC INDUSTRIAL CITIES SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
H8-
PROJECT NAME:
INDUSTRIAL PROVIDENTIAL CITY
SHORT NAME:
IPC
TOTAL LAND AREA PER PROJECT:
TEN THOUSAND HECTARES (10,000HA)
PROJECT LOCATION:
THIRTEEN (13) REGIONS IN THE REPUBLIC OF SENEGAL
QUANTITY:
13
TOTAL LAND AREA OF THE THIRTEEN (13) SMART FUTURISTIC INDUSTRIAL CITIES:
ONE HUNDRED AND THIRTY THOUSAND HECTARES (130,000HA).
FIFTEENTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC AGRICULTURAL CITIES SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
H9-
PROJECT NAME:
TERANGA AGROPOLES WORLD
SHORT NAME:
TAW
TOTAL LAND AREA PER PROJECT:
TEN THOUSAND HECTARES (10,000HA)
PROJECT LOCATION:
THIRTEEN (13) REGIONS IN THE REPUBLIC OF SENEGAL
QUANTITY:
13
TOTAL LAND AREA OF THE THIRTEEN (13) SMART FUTURISTIC AGRICULTURAL CITIES:
ONE HUNDRED AND THIRTY THOUSAND HECTARES (130,000HA).
SIXTEENTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC ENTERTAINMENT CITIES SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
H10-
PROJECT NAME:
TERANGA ENTERTAINMENT CITY
SHORT NAME:
TEC
TOTAL LAND AREA PER PROJECT:
ONE THOUSAND HECTARES (1,000HA)
PROJECT LOCATION:
THIRTEEN (13) REGIONS IN THE REPUBLIC OF SENEGAL
QUANTITY:
13
TOTAL LAND AREA OF THE THIRTEEN (13) SMART FUTURISTIC ENTERTAINMENT CITIES:
THIRTEEN THOUSAND HECTARES (13,000HA).
SEVENTEENTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC FESTIVAL CITIES SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
H11-
PROJECT NAME:
TERANGA FESTIVAL CITY
SHORT NAME:
TFC
TOTAL LAND AREA PER PROJECT:
ONE THOUSAND HECTARES (1,000HA)
PROJECT LOCATION:
THIRTEEN (13) REGIONS IN THE REPUBLIC OF SENEGAL
QUANTITY:
13
TOTAL LAND AREA OF THE THIRTEEN (13) SMART FUTURISTIC FESTIVAL CITIES:
THIRTEEN THOUSAND HECTARES (13,000HA).
EIGHTEENTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC RENEWABLE ENERGETIC ZONES SHALL BE ADDRESSED:
TO:
MVP FOUNDATIONS INTERCONTINENTAL DEVELOPMENT INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
I-
PROJECT NAME:
MILLENNIUM GREEN ENERGETIC ZONES
SHORT NAME:
MILGEZ
TOTAL PRODUCTION CAPACITY PER ZONE:
TWENTY-FIVE GIGAWATT (25GW).
PROJECT LOCATION:
THIRTEEN (13) REGIONS IN THE REPUBLIC OF SENEGAL
QUANTITY:
13
TOTAL PRODUCTION CAPACITY OF THE THIRTEEN (13) SMART FUTURISTIC RENEWABLE ENERGETIC ZONES:
THREE HUNDRED AND TWENTY-FIVE GIGAWATT (325GW).
NINETEENTH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC RENEWABLE RAIL INFRASTRUCTURES SHALL BE ADDRESSED:
TO:
MVP FOUNDATIONS INTERCONTINENTAL DEVELOPMENT INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
J1-
PROJECT NAME:
SMART RAIL-TECH CITY
SHORT NAME:
SMARTEC
PROJECT LOCATION:
TAMBACOUNDA, SENEGAL
PROJECT LOCATION:
TOTAL LAND AREA OF THE PROJECT:
SEVEN THOUSAND AND FIVE HUNDRED HECTARES (7,500HA)
J2-
PROJECT NAME:
SENEGAL METRO
SHORT NAME:
SEN METRO
PROJECT LOCATION:
THROUGHOUT THE FORTY-SIX (46) DEPARTMENTS OF THE REPUBLIC OF SENEGAL.
J3-
PROJECT NAME:
ECONOMIC INTEGRATION TRAIN
SHORT NAME:
ECOTRAIN
PROJECT LOCATION:
THROUGHOUT FIFTY-FOUR (54) MEMBER-STATES OF THE AFRICAN UNION (AU).
J4-
PROJECT NAME:
TERANGA TRAMWAY
SHORT NAME:
TERATRAM
PROJECT LOCATION:
IN EACH NEW SMART CITY
J5-
PROJECT NAME:
WEST AFRICAN HIGH-SPEED TRAIN
SHORT NAME:
WESTRAIN
PROJECT LOCATION:
THROUGHOUT THE FIFTY-FOUR (54) MEMBER-STATES OF THE AFRICAN UNION (AU).
TWENTIETH LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC ULTRAMODERN AND SOPHISTICATED NATIONWIDE BORDER SECURITY INFRASTRUCTURES SHALL BE ADDRESSED:
TO:
MVP FOUNDATIONS INTERCONTINENTAL DEVELOPMENT INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
K1-
PROJECT NAME:
TERRITORIAL ELECTRIFIED UNIVERSAL BUNKERS
SHORT NAME:
TEUB
PROJECT LOCATION:
NATIONWIDE SECURITY WALLS
PROJECT LOCATION:
TOTAL LAND AREA OF THE PROJECT:
THROUGHOUT THE GROUND BORDERS
K2-
PROJECT NAME:
BUREAU DES OPÉRATIONS UNIVERSELLES DE NATURALISATION SUR LE TERRITOIRE
SHORT NAME:
BOUNT
PROJECT LOCATION:
AT THE BORDERS WITH MAURITANIA, MALI, GUINEA-CONAKRY AND GUINEA-BISSAU
K3-
PROJECT NAME:
DOMAINE ÉCONOMIQUE FRONTALIER
SHORT NAME:
DEF
PROJECT LOCATION:
AT THE BORDERS WITH MAURITANIA, MALI, GUINEA-CONAKRY AND GUINEA-BISSAU
K4-
PROJECT NAME:
CENTRE DE COMMANDEMEMT TERRITORIAL ET DE VIDÉOSURVEILLANCE
SHORT NAME:
CCTV
PROJECT LOCATION:
AT THE BORDERS WITH MAURITANIA, MALI, GUINEA-CONAKRY AND GUINEA-BISSAU
K5-
PROJECT NAME:
GREAT ATLANTIC WALL
SHORT NAME:
GAW
PROJECT LOCATION:
ALL ALONG THE ATLANTIC COASTAL BORDERS
K6-
PROJECT NAME:
HALL OF ATLANTIC TERRITORY
SHORT NAME:
HALAT
PROJECT LOCATION:
AT THE MARITIME BORDERS OF THE ATLANTIC OCEAN COASTAL MUNICIPALITIES
TWENTY-FIRST LOI AND QUOTATIONS TO BE ISSUED BY AAA AND AA RATED GLOBAL EPC CONTRACTORS FOR THE FOLLOWING 22ND CENTURY STATE-OF-THE-ART WELL INTEGRATED ULTRAMODERN INTERNATIONAL SMART FUTURISTIC ULTRAMODERN SMART LANDMARK SKYSCRAPERS SHALL BE ADDRESSED:
TO:
TERANGA GRAND VISION HOLDINGS INC.
ATTN: PRINCE M.N (PRESIDENT & CEO)
CC:
MOHEYALDEEN A
DABBAH (TREASURER)
L1-
PROJECT NAME:
ALLAWARTA ROYAL COMPLEX
SHORT NAME:
ARC99 TOWERS
PROJECT LOCATION:
SEDHIOU, SENEGAL
L2-
PROJECT NAME:
ALLATENTO IMPERIAL COMPLEX
SHORT NAME:
AIC114 TOWERS
PROJECT LOCATION:
SEDHIOU, SENEGAL
L3-
PROJECT NAME:
ALLABATOU ORIGINAL COMPLEX
SHORT NAME:
AOC92 TOWER
PROJECT LOCATION:
SEDHIOU, SENEGAL
L4-
PROJECT NAME:
ALLAYANFO DYNASTIC COMPLEX
SHORT NAME:
ADC88 TOWERS
PROJECT LOCATION:
SEDHIOU, SENEGAL
L5-
PROJECT NAME:
NEW ORBITAL DISTRICT
SHORT NAME:
POLE NORD
PROJECT LOCATION:
DIENDE, SENEGAL
L6-
PROJECT NAME:
SEDHIOU UNIVERSAL DISTRICT
SHORT NAME:
POLE SUD
PROJECT LOCATION:
DAKAR, SENEGAL
L7-
PROJECT NAME:
WEALTHY ECONOMIES STATEHOUSE
SHORT NAME:
WEST POLE
PROJECT LOCATION:
BAKEL, SENEGAL
L8-
PROJECT NAME:
TERANGA ECONOMIC CONGLOMERATE
SHORT NAME:
TEC
PROJECT LOCATION:
JOHANNESBURG, SOUTH AFRICA
L8-
PROJECT NAME:
SEDHIOU ECONOMIC CONGLOMERATE
SHORT NAME:
SEC
PROJECT LOCATION:
CASABLANCA, MOROCCO
L9-
PROJECT NAME:
PAKAO ECONOMIC CONGLOMERATE
SHORT NAME:
PEC
PROJECT LOCATION:
DAR ES SALAAM, TANZANIA
VERY IMPORTANT REMARKS
ALL LETTERS OF INTEREST (LOI) AND QUOTATIONS ISSUED BY THE ELIGIBLE AAA AND AA RATED GLOBAL EPC CONTRACTORS AND ARCHITECTS SHALL BE SENT TO THE FOLLOWING E-MAIL ADDRESSES ALONG WITH THEIR 2025 UPDATED COMPANY PROFILES.
A-
FOR THOSE ADDRESSED TO MVP FOUNDATIONS INTERCONTINENTAL DEVELOPMENT INC.
B-
FOR THOSE ADDRESSED TOTERANGA GRAND VISION HOLDINGS INC.
C-
UPON RECEIVING THE LETTERS OF INTENT (LOI) ALONG WITH THE APPROXIMATE FINANCIAL ESTIMATES AND COMPANY PROFILES OF THE POTENTIAL BIDDERS, WE WILL PREPARE AND PROVIDE THE FOLLOWING COMPREHENSIVE BASIC POINTS TENDER SYSTEM.
C1-
THE PRE-TENDER PREPARATION:
1)
DEFINE PROJECT SCOPE AND OBJECTIVES:
CLEARLY OUTLINE THE PROJECT’S REQUIREMENTS, DELIVERABLES, AND KEY PERFORMANCE INDICATORS (KPIs).
2)
CONDUCT FEASIBILITY STUDIES AND ASSESSMENTS: ENGAGE CONSULTANTS TO ASSESS THE PROJECT’S TECHNICAL, FINANCIAL, AND ENVIRONMENTAL VIABILITY.
3)
DEVELOP A DETAILED PROJECT SCHEDULE: ESTABLISH A REALISTIC TIMELINE INCLUDING MILESTONES AND DEADLINES.
4)
ESTABLISH A BUDGET AND FUNDING PLAN: DETERMINE THE PROJECT’S BUDGET AND EXPLORE FUNDING OPTIONS, INCLUDING GOVERNMENT INCENTIVES OR PRIVATE FINANCING.
WE HAVE ALREADY SECURED AND MOBILIZED THE ENTIRETY OF THE PROJECTS FUNDING.
5)
ASSEMBLE A TENDER TEAM (TECHNICAL): PREPARE THE DOCUMENTS ABOUT THE COMPANY, DPR, DEVELOPMENT STEPS, ALL REQUIREMENTS, TECHNICAL AND FINANCIAL SPECIFICATIONS, TENDER AND EXECUTION PROCESS, LEGAL RESPONSIBILITIES, DETAILED TERMS & CONDITIONS, ETC.
C2-
TENDER DOCUMENT PREPARATION (RFP):
1)
DEVELOP A COMPREHENSIVE TENDER DOCUMENT: INCLUDE PROJECT DETAILS, TECHNICAL / FINANCIAL SPECIFICATIONS, EVALUATION CRITERIA AND CONTRACT TERMS.
2)
CLEARLY OUTLINE EVALUATION CRITERIA: ESTABLISH WEIGHTED CRITERIA FOR EVALUATING BIDS, SUCH AS TECHNICAL EXPERTISE, FINANCIAL CAPACITY AND EXPERIENCE.
3)
INCLUDE A TRANSPARENT PRICING MECHANISM: SPECIFY HOW PRICES WILL BE EVALUATED AND COMPARED.
4)
PROVIDE A DETAILED CONTRACT TEMPLATE:
OUTLINE THE TERMS AND CONDITIONS OF THE CONTRACT, INCLUDING PAYMENT SCHEDULES, WARRANTIES AND DISPUTE RESOLUTION MECHANISMS.
C3-
TRANSPARENCY AND FAIRNESS MEASURES:
1)
USE AN OPEN AND COMPETITIVE TENDERING PROCESS: ADVERTISE THE TENDER GLOBALLY AND ALLOW ALL QUALIFIED BIDDERS TO PARTICIPATE.
2)
IMPLEMENT A SECURE AND ANONYMOUS BIDDING PROCESS:
USE ELECTRONIC BIDDING PLATFORMS OR SEALED BIDS TO ENSURE ANONYMITY AND SECURITY.
3)
ESTABLISH A FAIR AND IMPARTIAL EVALUATION COMMITTEE: COMPRISE THE COMMITTEES OF INDEPENDENT EXPERTS AND ENSURE THEY DECLARE ANY CONFLICTS OF INTEREST.
4)
PROVIDE REGULAR UPDATES AND COMMUNICATION: KEEP BIDDERS INFORMED ABOUT THE TENDER PROCESS AND RESPOND TO THEIR QUERIES IN A TIMELY AND TRANSPARENT MANNER.
C4-
ISSUES TO ADDRESS:
1)
CONFLICT OF INTEREST:
ENSURE THAT THE EVALUATION COMMITTEE MEMBERS, PROJECT TEAM MEMBERS AND OTHER STAKEHOLDERS DECLARE ANY CONFLICTS OF INTEREST.
2)
BIDDER QUALIFICATION: ESTABLISH CLEAR AND TRANSPARENT QUALIFICATION CRITERIA FOR BIDDERS AND ENSURE THEY MEET ALL THE REQUIRED STANDARDS (TECHNICAL AND FINANCIAL).
3)
INTELLECTUAL PROPERTY PROTECTION:
PROTECT THE INTELLECTUAL PROPERTY RIGHTS OF BIDDERS AND ENSURE THAT THEIR PROPRIETARY INFORMATION IS KEPT CONFIDENTIAL.
4)
DISPUTE RESOLUTION:
ESTABLISH A CLEAR DISPUTE RESOLUTION MECHANISM AND ENSURE THAT IT IS FAIR, TRANSPARENT AND TIMELY.
C5-
STEPS TO TAKE:
1)
DEVELOP A TENDER TIME-LINE: ESTABLISH A DETAILED PROJECT REPORT (DPR) AND CLEAR (TECHNICAL / FINANCIAL) REQUIREMENT FOR THE TENDER PROCESS, INCLUDING KEY MILESTONES AND DEADLINES ALONG WITH THE RESPONSE SYSTEM FROM THE COMPANY SIDE.
2)
ADVERTISE THE TENDER:
ADVERTISE THE TENDER GLOBALLY, USING OUR PORTAL AND NEWSPAPERS, SOCIAL MEDIA, ETC.
3)
CONDUCT BIDDER BRIEFINGS:
HOLD BRIEFINGS WITH POTENTIAL BIDDERS TO CLARIFY THE TENDER REQUIREMENTS AND ANSWER THEIR QUESTIONS (RFP/FAQ/SUPPORTS).
4)
EVALUATE BIDS: EVALUATE BIDS BASED ON THE ESTABLISHED EVALUATION CRITERIA AND ENSURE THAT THE PROCESS IS FAIR, TRANSPARENT AND TIMELY.
(WE WILL CREATE 2 STEPS:
1) TECHNICAL QUALIFICATION,
2) FINANCIAL QUALIFICATION
5)
AWARD THE CONTRACT:
AWARD THE CONTRACT TO THE SUCCESSFUL BIDDER AND ENSURE THAT THE CONTRACT TERMS ARE FAIR, REASONABLE AND COMPLIANT WITH REGULATORY REQUIREMENTS.